In the heart of downtown Manchester, New Hampshire, construction of a Tru by Hilton Hotel needed systems and products that could withstand the conditions. Securock® ExoAir® 430 panels were chosen to assist with critical path reduction and meet shell dry-in goals.
Cold New England winters in Manchester, New Hampshire, can lead to prolonged downtime of construction sites. When construction of a Tru by Hilton hotel was slated to begin, the general contractor knew they needed systems and products that could not only withstand the weather conditions, but would also be approved by the city of Manchester for longevity, durability, energy, and fire codes.
The construction team chose NewBrick® insulated brick veneer and Dryvit® Outsulation® Plus MD continuous insulation (CI) systems for their performance and installation advantages. USG and Tremco's Securock® ExoAir® 430 sheathing and pre-applied air barrier system was chosen to assist with critical path reduction and meet shell dry-in goals. These were then sealed with the compatible Dymonic® 100 urethane sealant.